Friday, March 21, 2014

The Journal de Montréal on the Delights of Verdun's Wellington St.

 The Journal has a nice spread with photos talking about Verdun's renaissance and especially about our vibrant main drag, Wellington, or "la Well" as apparently the hipsters are calling it.

'Tis true that not so long ago the only reason you'd see mention of Verdun in the local papers was if someone set fire to a building in an insurance scam, got shot or a patient at the Douglas Hospital wandered off the grounds. Those days are gone.

Now, thanks to its affordable housing, excellent public transit and proximity to the beautiful St. Lawrence River, Verdun is attracting young families and enrepreneurs with plenty of ideas and energy.
Fromagerie Copette + Cie
The Journal talks about some of great boutiques and restaurants: Boulangerie Sweet Lee's, Copette + cie, a fancy cheese shop with excellent bread and Belgian waffles on the weekend, Benelux, the artisanal brasserie in the old Bank of Montreal building, Blackstrap BBQ and Station W, recently voted one of Montreal's top 10 cafes.
Station W

Why would anyone want to live anywhere else?



Samcon, Montreal Condo Developer, Proposing Massive Project on Point Rail Yards

Twitter is exploding this morning (well, at least among urban development geeks) with news that Samcon, a condo builder known for its small-scale and affordably priced condo projects, has announced plans to build 850 condos on the old CN rail yards in Point St. Charles.
The rail yards are south of Bridge St. and east of Wellington. I've just noticed that Google has written "Sebastapol" as "Sevastopol". Hm, does this have anything to do with Russia's annexation of Crimea?

No news release yet, but the company, which has found success by targeting first-time and mid-price buyers, says that 75 per cent of the offering will be "affordable" housing.
Two things, what will the reaction be in the Point, where residents are well and truly fed up with the traffic and congestion that a spate of new construction has brought to the usually quiet residential streets.
Second, the land Samcon is looking at is the same parcel that the Casino de Montréal has been eyeing for some time. Before that, it seems to me that developer Vincent Chiara had a scheme to build a shopping mall and some housing.
According to reports, Sam Scalia, Samcon's president, says the new project and future projects will be developed according to principles of walkability and will be located close to public transit.
Not sure how that squares with the railyard, which is accessible to Wellington St. and a direct bus to downtown but nowhere close to a metro station.
More to come, no doubt. 



Monday, March 3, 2014

Verdun to Get an Aquatic Centre

Fantastic news out of Verdun borough hall today. The local council has been quietly working towards building an indoor aquatic centre since 2009. Today, they've gone public with a budget - $18.6 million - and a projected opening date - 2016.

The complex will be built in Therrien Park, a riverside park in the south east corner of the borough. It's the last park before you hit Highway 15 South to Nuns' Island. Therrien Park already has baseball diamonds, football fields, tennis courts, a skateboard park, an outdoor pool and wading pool with water features, a playground, chalet and dog park. 

The park is also close to the Verdun Auditorium, a sometime home to junior hockey, heavy metal concerts and pro wrestling bouts. The borough is looking at redeveloping the Aud to get more use out of the arena. This could be the beginning of a new cultural and sporting axis in southwest Montreal. Woot woot!





Verdun already possesses one of the nicest outdoor pool complexes in Montreal. Our Art Deco Natatorium, built in the 1930s, was at one time considered the largest public swimming complex in Canada. It was built during the Depression and finished in 1940. Olympic swimming gold medalist Johnny Weismuller, who was also the star of the Tarzan movies, inaugurated the Nat in 1940. For indoor swimming, Verduners have had to use pools inside local high schools.

Today, the Nat has  a heating wading pool. Navi, a kayak-rental company, operates from a kiosk outside the Nat all summer long. It remains a beautiful swimming pool, with sight lines on the blue water of the St. Lawrence River.  Dreaming of summer. . .


Friday, February 28, 2014

Calculating Your Mortgage Insurance Premium

Here's an excellent video from RateHub that explains how mortgage insurance is calculated. Viewer beware, these are not Montreal prices they are playing with!



Hat tip to Allison Lampert of The Gazette for this.

Canada Mortgage and Housing Corp. to Increase Mortgage Insurance Premiums May 1

 Anyone buying a home in Canada and who has less than 20 per cent of the purchase priceto use as a down payment  is going to see the cost of that purchase increase a little bit come May 1st, 2014.

The increase will happen because the Canada Mortgage and Housing Corp., a federal agency that insures all so-called high ratio mortgages, is raising its premiums by 15 per cent. It is the CMHC's first hike since the late 1990s.

CMHC mortgage insurance allows those with a modest down payment to get their foot in the home ownership door. Depending on the size of a buyer's down payment, the insurance premium currently ranges from 0.5 per cent and 2.75 per cent of the purchase price. On a $250,000 purchase, that translated to a $6,875 premium paid down over the life of the mortgage.

Under the new fee structure, the premium will rise to a maximum of $7,875, an added cost of about $5 per month on the typical 25-year, $250,000 mortgage. (We always use the $250,000 example but the average cost of a Montreal single-family  home is actually close to $291,000. Let's not be too picky.)

On its own, the rate increase is not a killer, but it does come a 18 months after CMHC tightened mortgage rules so that buyers can spread their mortgage over a maximum of 25 years instead of 30. That sidelined some first-timers who were scared off by the prospect of seeing their mortgage payments climb by more than $150 a month.Here comes another $5.

The CMHC has a handy chart showing the different cost increases.

The rate change will not affect anyone who already has a CMHC-backed mortgage, only new business. The effects won't be as dramatic as the change to amortization rules instituted in June, 2012. Still, every time the feds tinker, the market tightens just a bit.




Thursday, February 6, 2014

Verdun Love

 Life in Verdun means life lived in rhythm with the mighty St. Lawrence. The sun rises over the open water and at night the moon casts a silver bright light on the rippling current. It is even beautiful in winter, though the boardwalk is buried under feet of snow.
photo credit: Comité embellissement Verdun



Sunday, January 19, 2014

Semi-subterranean Homesick Blues

 Montreal's Plateau Mont-Royal borough has implemented new rules that will sharply curtail the construction of semi-basement or "garden-level" condominiums. 

For the purposes of the bylaw, a garden-level condo is one in which 60 per cent of the living space is located below the level of the sidewalk. This housing type made huge inroads during the go-go construction boom that began in the late 1990s, as builders sought to maximize the number of units they could cram into their buildings while still respecting height limitations.

 In the Plateau, for example, that often meant that buildings could not be taller than the area's triplexes. One strategy might be to build a half storey below the ground, and three stories up, still within the height restriction and conveniently less than four floors.  Another benefit of building fewer than four stories and yet more than three was that Quebec's building code states that buildings with three floors can be built of wood frame, while those measure more than four must be made of poured concrete.

The problem was that a lot of these half basements were pokey and dark, with windows that let in little light and less air. At least, that's what a 2010 Plateau study seemed to indicate. Of 29 proposed  projects, 19 were to be built in high traffic areas where basement windows would offer little natural light, unappealing views and too much noise.

From now on, Plateau semi-basement condos will be permitted only on strictly residential streets and even then builders will have to ensure that windows are set back a minimum of 1.5 metres from the sidewalk. The space between the window and the sidewalk will have to be 60 per cent planted, not paved. Further, the setback from any parking area on the property will be a minimum of two metres.

In most cases, the new rules will mean that promoters will incorporate the semi-basements into their ground-floor units. It might even be that by tweaking the bylaws, the borough will help make the Plateau more attractive to families looking for homes with room for kids to live, sleep and play.

So far, the Plateau stands alone with these new rules, though the Sud-Ouest borough is said to be looking at them with interest. You can read more about it in La Presse.

Wednesday, October 30, 2013

What Were They Thinking?


























No, that's not dog pee in the carpet. It's a feature.

Monday, October 7, 2013

Space-age, Spacing-saving Italian Design.


The trend towards smaller condos is here to stay and with it comes a trend towards compact, space-saving furniture. One of my clients was recently looking for a murphy bed for the guest room in her sleek loft near the the Lachine Canal. She wanted something both stylish and practical - a fold-out bed hidden behind a desk and bookshelf set up, for example. This video is making the rounds just a little too late for my canal-side acquaintance, but it might be of interest to someone else out there hoping to add a little Italian brio to their home decor.

Best of all, Montreal's Fraser Furniture is the exclusive retailer for this totally cool line.

Wednesday, October 2, 2013

Montreal Real Estate Board says Buh-bye to Cdn Real Estate Association

The Greater Montreal Real Estate Board, Canada's second largest,  has served notice that it will withdraw from the Canadian Real Estate Association at the end of 2013. Quebec members pay about $3.4 million in CREA dues annually.

The GMREB represents 10,000 or so brokers, roughly a tenth of all CREA's membership.  The national organization represents boards across Canada. The two have been at odds for years, with Montreal complaining about CREA's weak defense of Quebeckers' interests, spending, dues increases and the services members receive in return.

The big item is CREA's unwillingness or inability to block "for sale by owner" (FSBO) properties from the realtor.ca system in Quebec. These listings are legal in other jurisdictions but not in Quebec, where only brokers licensed through the provincial licensing agency, the OACIQ, are allowed to market and sell properties on behalf of a third party. This makes Quebec different from the rest of Canada.

Quebec's 12 boards were worried enough about the possibility of FSBOs being listed on the realtor.ca that they launched their own property-search website, centris.ca. It has asked CREA to default to  Centris rather than Realtor for all Quebec property searches. So far, no response.

In a letter to members, the GMREB included links to two Montreal area FSBO listings recently posted to realtor.ca through a Toronto listing service affiliated with the Toronto Real Estate Board. That back door move bypasses Quebec's licensing and professional oversight requirements.

You can see how there would be irritation and hurt feelings, right?

But FSBOs aren't the only irritant. Montreal is also reluctant to take part in a national data distribution system that would put information collected by GMREB members into the hands of cut-rate sales firms and FSBOs. Data like average selling prices, days on the market, etc is gold to real estate professionals and, presumably to those who would feast on our labour. We've paid to have it collated by our association. We aren't about to give it away to the Du Proprios of the world.

There are other issues, as well. CREA wants to create a national code of ethics for real estate professionals. GMREB opposes the idea because its primary role is to protect and promote its membership.  Quebec brokers are bound by a code of ethics administered by the OACIQ. The OACIQ fields complaints from the public, investigates, adjudicates and punishes brokers who break the rules. Best of all, every broker pays dues to maintain the agency even though we get no benefit from it. Needless to say, GMREB has no interest in  paying for the implementation of a second code of ethics.

Finally, GMREB has been asking questions about where the CREA dues end up. Remember, this is Quebec, where we know a thing or two about expense-account padding, lavish dinners, cocktail parties, exotic meeting locales etc etc. Quebec's federation of real estate boards complained about lavish spending and duplication of services. For its part. GMREB managed to claw back $1.5 million in CREA dues in the last two years and has used the money to promote centris.ca and for other advertising tailored to the Quebec market.

Talks have been ongoing, but now the time of talking seems to be over. CREA is having a special general meeting later this month in Vancouver. According to the Montreal board, despite promises to the contrary, none of Quebec's concerns are addresses on the meeting's agenda.

Unless something changes between now and then, Quebec will cut itself loose from CREA's mothership. Says GMREB president Patrick Juanèda:

 Your Board of Directors has evaluated the situation carefully and considers that, at this time, the risks and disadvantages outweigh the benefits of our membership in CREA. It is important to note that the code of ethics and data distribution rules are already in place. If we stay in CREA, we must ensure that we implement the necessary structures and have all of our members comply with them.

The board reserves the right to change its mind, especially if CREA responds to its concerns at the upcoming general meeting. Stay tuned.

************************************************************

While we're on the topic of people being annoyed by the way in which their dues are spent, there's a petition going around that takes issue with the way the OACIQ is spending brokers' money.

The straw that broke the camel's back is a recently announced mandatory course for all real estate brokers on the importance of "collaboration". Collaboration is what happens when one broker calls another broker  to see a property. If you show it, you are collaborating. If you ignore the call or multiple calls, you  are not collaborating. Pretty simple. The OACIQ is requiring all license holders to take take this 2-hour on-line course at a cost of $150 each.

$150 each and they don't even have to rent a room, put on a pot of coffee or lay out a tray of danish. That's an easy $2.6 million for the licensing agency. That's on top of the $16.3 million it collected in annual dues from saps like me in 2012.

People see this training as little more than a cash grab. They are concerned that if the OACIQ gets away with this it will implement more and more "imporatant"  mandatory training at extra cost to the dues payers. It's the Quebec way, right? Can't balance your budget? Raise fees! Implement surcharges! Create a new tax!  Easy money, right? The English version of the petition has 450+ signatures. The French version, nearly 2,900.

Here's the petition.